Introduction

One of the most important concerns of urban plans is the control of surface water and domestic and industrial wastewater. Pars Technical and Engineering Group has in its brilliant resume the implementation of sewage lines in Shiraz city, one of the most important of which is the implementation of sewage transmission lines on Shahid Kasai Blvd and Farhang Shiraz city.

Employer:

Shiraz Water and Wastewater Company

Consultant:

-

Contractor:

ParsNasb.Co

Work size and dimensions: implementation of sewage transmission lines with double-walled Carrogate pipes with a diameter of 200 to 600 mm and implementation of in-situ and prefabricated brick and concrete manholes.