Zone 11 and 14 project of the World Bank contract for the implementation of the polyethylene water transmission network located in the Aram region and the soil science of Shiraz

Introduction

With the presence of the World Bank in the water and sewage projects of Shiraz in 1985 and the extensive investment in this field, Parsnasb Afarin Engineering Company is proud of the presence and implementation of various operations including GRP and polyethylene water transmission lines in a very large area in both zones 11 and 14

Employer:

Shiraz Water and Wastewater Company

Consultant:

Contractor:

ParsNasb Afarin Co.

Work size and dimensions: implementation of water transmission lines with 200 to 800 mm GRP pipe and 110 mm to 300 mm polyethylene pipe and implementation of all brick and concrete manholes in all dimensions