Implementation of water transmission lines of Poolan sector reservoirs located in Chabahar, Sistan and Baluchistan province

Introduction

Pars Nasb Afarin Engineering Company, relying on its manpower and experience, with its presence in the deprived area of Sistan and Baluchistan province, carried out construction operations in the Chabahar plan area, and considering the importance of implementing transmission lines in a variety of diameters and types of pipes in this area. He did what was necessary and the result was timely delivery and the satisfaction of the employer.

Employer:

Sistan and Baluchistan Water and Wastewater Company

Consultant:

Contractor:

ParsNasb Afarin Co.

Work size and dimensions: execution of 600 mm GRP pipe and execution of 400 mm GRP pipe and execution of 160 mm polyethylene pipe and execution of welded metal pipe with a diameter of 600 mm.